News Summary
A $27.5 million pavement improvement project is set to begin on US 93, enhancing 13 miles of highway between Phoenix and Las Vegas. The Arizona Department of Transportation aims to replace worn asphalt and improve road safety. Construction will primarily take place overnight to minimize traffic disruption, with necessary restrictions during the project. Expected completion is by spring 2026, ensuring a safer travel experience for motorists along this key route.
Phoenix
A $27.5 million pavement improvement project along US 93, the main highway route connecting Phoenix and Las Vegas, is set to begin soon. The project will upgrade 13 miles of highway from Moore Ranch Road (milepost 185) to milepost 172, northwest of Wickenburg. The Arizona Department of Transportation (ADOT) is managing the effort to replace worn asphalt, ensuring safer and more reliable travel for motorists.
Construction Schedule and Traffic Management
Most construction work is scheduled to take place overnight from Mondays to Fridays to minimize disruption to traffic during peak travel times. However, daytime and weekend restrictions will be implemented periodically throughout the project duration. Motorists should be prepared for US 93 to be reduced to one lane at times. Traffic flow through the construction zone will be managed by pilot cars that will alternate the direction of traffic.
In addition to lane reductions, flaggers will be stationed to assist motorists, halting traffic as necessary to facilitate safe travel through the work area. Travelers on this critical route are advised to remain vigilant and allow extra time for potential delays.
Scope of Work
The pavement improvement project will include a variety of tasks aside from the asphalt replacement. Key components of the project involve:
- Replacing guardrails and end terminals
- Repairing a bridge deck
- Installing new pavement markings
These enhancements are aimed at improving road safety and driving conditions. The project is anticipated to be completed by spring 2026, at which point the roadway will offer a more durable and enhanced driving experience for all users.
Public Notification and Updates
ADOT is committed to keeping the public informed about any changes or restrictions related to the pavement improvement project. Notices about road restrictions will be made available on the project’s dedicated webpage, allowing motorists to stay updated on the ongoing work and plan their routes accordingly.
Background Information
The stretch of US 93 between Phoenix and Las Vegas plays a vital role in facilitating travel and commerce between the two cities. With traffic volumes increasing over the years, maintaining the integrity of the highway is essential. The investment in this pavement improvement project reflects a commitment to highway safety and infrastructure by state transportation officials.
As all construction projects come with inherent challenges, both motorists and local residents are encouraged to exercise patience and caution as the improvements unfold over the coming months.
Deeper Dive: News & Info About This Topic
HERE Resources
SRP Linemen Ensure Reliable Power in Severe Weather
Hadrian Invests $200 Million in New AI-Powered Facility in Mesa
Phoenix Receives Major Renovation Grant for Women’s Transitional Home
New Thai Restaurant Opening at Historic Moeur House in Tempe
Toyota Invests $50 Million in Arizona Proving Grounds Expansion
Phoenix City Council Adopts New Building Construction Code
Toyota Invests $50 Million in Arizona Proving Grounds Expansion
Governor Hobbs Opposes Trump’s Healthcare Bill Amid Concerns
Phoenix Shatters Heat Record with 116 Degrees Fahrenheit
University of Arizona Launches Accelerated Medical Degree Program
Additional Resources
- AZCentral: Speeding Ticket Information
- Google Search: Arizona traffic laws
- KTAR: US 60 Crash in Gold Canyon
- Wikipedia: Traffic collision
- Gila Herald: Most Dangerous Intersections
- Encyclopedia Britannica: Traffic Accident
- KTAR: Loop 202 Mesa Crash
- Google News: Arizona crash news
